Case Study

Siemens Healthcare

  Location:  Liverpool

  Value of Works:  £522,000

  Tender & Design Period:  20 Weeks

  Time on Site:  26 Weeks

Purpose of the Project

A multi-modality equipment project which was originally undertaken by a previous main contractor, and which was then taken over for completion by another contractor.

The works undertaken by ABC were initially carried out in 2017/2018 then due to the change in contractor, completed in 2022.

Works Undertaken on Site

  • Construction works.
  • RF works.
  • Magnetic shielding
  • Electrical works
  • Mechanical works

Challenges

  • Working on a project that had stood dormant for a number of years.
  • Revisiting and testing of the original installation for signs of damage and degradation
  • Identifying and replacement of critical plant
  • Confirming design old/ versus new
  • Working also in a live shopping centre
  • Installation of magnetic shielding into an area not under control of the NHS which required additional planning.

  More Case Studies